To-do List of TD Demodulation integration

  1. Cholesky Decomposition is clear now. (done)
  2. Fix timing violation of Matched Filter. Need to add a pipeline stage at the input data from Block-V and E0/E1 buffers. (done)
  3. Fix timing violation of Correlation Matrix Gen. Need to add a pipeline stage at the input data from Block-V buffer, and also at the Block-V address generation. (done)
  4. Replace the W-ROM of Channel Estimation with a fast process library. (done)
  5. Add enable signal at latching point on multi-cycle path.