Meeting Minutes 2008/4/18
Attendees
1. Second round reviewing on DCC & DAGC algorithm spec, presented by Zheng Ming.
- DSP Team: Zhu Shiyi, Yin Xiaojun
- Algorithm Team: Liu Shi, Zhou Liang, Zheng Ming
- ASIC Team: Zhao Xikai, Xia Bin, Peng Weifeng
- Review Rx DCC & DAGC algorithm spec
- Review TD-SCDMA modem development schedule
1. Second round reviewing on DCC & DAGC algorithm spec, presented by Zheng Ming.
- a. Issue-1: How to determine the historical DC value used in Alpha filter for calculating DC of current TS. This is an algorithm issue, and will not affect the HW implementation.
- b. Issue-2: How to truncate the large bit width to small one in burst mode.
- c. Reserve the 37-bit RSSI value uncutted, which will be reported to DSP.
- d. Conclusion: the fixed-point algorithm is finalized by minor changes. ASIC person (Peng Weifeng) may start micro-arch design.
- a. ASIC will re-design the Tx BIM (bit-scrambling, 2nd interleaving, physical mapping) to support HSUPA.
- b. ASIC will design a new HARQ module for HSUPA, which also supports the nornal Rate Match path.
- c. ASIC will reuse the CRC module used in W-CDMA, but need a CRC wrapper to fit the interface to DSP.
- d. ASIC will reuse the Viterbi codec IP used in W-CDMA, so we are calling for the updated Viterbi design specification for understanding the design, which is must in the intergration stage and verfication stage.
- e. ASIC will resue the Turbo codec IP used in W-CDMA, which has the same issue as Viterbi.
- a. The system definition and HW/SW partition are almost finished for most sub-modules.
- b. The work flow will be going as: algorithm spec --> LLD iterations --> frozen algr spec --> micro-arch design --> RTL --> co-simulation.
- c. Schedule for uplink sub-module design has been reviewed.
- d. Schedule for downlink sub-module design is suspended at FFT engine, because the meeting is interrupted by another more urgent meeting.
- e. We'll resume the schedule review meeting for the remaining sub-tasks in downlink path some day next week, mainly for ICS, ChEs, and Joint-detection.
- Update the algorithm spec of DCC & DAGC upon the discussion today, and get it frozen. (Zheng Ming)
- Start micro-arch design on the module of DCC & Data-scaling. (Peng Weifeng)
- Start RTL verification of TX BIF sub-module. (Chen Gaohua, Peng Weifeng)
- Resume the TD schedule review meeting. (Zhu Shiyi, Liu Shi, Zhao Xikai, Xia Bin)
- Deliver Tx BIM system HLD spec including HSUPA path next week. (Zhu Shiyi)
- Review the spec of high-level timing scheduler and overall memory consumption, sketched by Zhu Shiyi. (DSP Team, Algr Team, ASIC Team)