Regular Team Meeting 2008/4/21
Attendees
Li Shuo, Chen Gaohua, Chen Chuntao, Peng Weifeng, Hao Shengguo, Zhang Yun, Zhao Xikai, Xia Bin
Topic
ASIC team regular meeting
Synopsis
Li Shuo
Li Shuo, Chen Gaohua, Chen Chuntao, Peng Weifeng, Hao Shengguo, Zhang Yun, Zhao Xikai, Xia Bin
Topic
ASIC team regular meeting
Synopsis
Li Shuo
- Finish gc200 FPGA testing last week
- Start setup the platform for TD-SCDMA FPGA testing, including RDA RF interface design.
- Chen Chuntao
- Studying the TD channel estimation, for verification purpose.
- Deliver a study summary on channel estimation upon understanding the algorithm spec in this week.
- Finish PMIC verification efforts.
- Re-verify the RRC Tx filter upon the design changes. Close this effort in this week.
- Start Tx BIF verification. Deliver test plan in this week.
- Be assigned the efforts on RTL coding for JD Block V generation.
- Review the algorithm spec of DCC & DAGC module.
- Deliver the micro-architecture spec of DCC & DAGC in this week.
- Investigate the TX BIM (bit-scrambling, 2nd interleaving, physical mapping) for supporting HSUPA
- Deliver the micro-architecture of Tx BIM.
- Be assigned the efforts on HARQ design, which supports both normal Rate-matching path and HSUPA path.
- Await finalization of TX BIM for modifying testbench.
- Tavor-LE gate-level simulation.
- Continue Tavor-LE gate-level simulation upon annotating the SDF of Mohawks IP.
- Setup PMIC SOS server in Shanghai.
- Review Chen Gaohua and Zhang Yun's SV testbench, and try to get them unified platform for TD datapath verification.
- Review the Verilog Design Guilde.
- Sketch out the Verilog Design Guide.
- Initiate the schedule and resource allocation for TD modem development.
- Review Rx DCC & DAGC.
- Consider the ASIC implementation of channel estimation.
- Start micro-arch design of Block V Generation.
- Start micro-arch design of Channel Estimation.
- Deliver test plan for verifying Rx DCC & DAGC.
- Review the Verilog Design Guilde.