Milestone List for Next Week

Following milestones would be achieved by the next weekend (Friday, May 9th, 2008)
  • L1 System Phase (Shiyi's Team)
  1. HSDPA HLD for BIM/EBIM interface design (Shiyi, Zhiliang)
  2. Measurement HLD (Shiyi, Michael)
  3. HSUPA LLD for BIM/EBIM interface design (Zhiliang)
  4. Block-V LLD interface design (Shiyi, Dengwei)
  • Algorithm Phase (Stone's Team)
  1. Channel Estimation fixed-point C code (Liang)
  2. DCC & DAGC fixed-point C code (Ming)
  3. EBIM LLD spec (NA)
  • ASIC Phase (Xikai's Team)
  1. Channel Estimation micro-architecture draft (Bin)
  2. DCC & DAGC testplan (Bin)
  3. DCC & DAGC RTL design (Weifeng)
  4. Tx BIF testplan (Gaohua)