Weekly Report 2008/5/24
Status update of Tavor-TD
- Channel Estimation micro-architectural design and documentation. This task is 80% finished. (Bin)
- Ongoing JD LLD iteration with algorithm engineer. (Bin)
- Ported simulation environment from modelsim to vcs. (Shuo)
- Turbo encoder simulation is ok, still debugging decoder.Need more knowledge about modem and turbo codec itself. (Shuo)
- Completed RTL coding of the EBIM and start debugging. (Shengguo)
- Write rough RM/HARQ spec. (Shengguo)
- EBIM verification plan and test plan review . (Yun)
- Write EBIM testbench and write basic reset/register test case. (Yun)
- Finished DCC & DAGC testbench design and start verification. (Chuntao)
- Debugging RTL of DCC & DAGC. (Weifeng)
- Finished RTL revision of Tx BIF. (Weifeng)
- Completed RTL coding of Block-V Generation, and start debugging. (Gaohua)
- Modified the Tx BIF testbench according to the revised RTL design and C-model. (Gaohua)
- Deliver the RTL code of TDMA engine. (Lu)
- Deliver Channel Estimation micro-arch design spec, and get it reviewed. (Bin)
- Start JD matched filter micro-architectural design. (Bin)
- Study turbo codec algorithm (Shuo)
- Trace the design and gain more information about turbo codec. (Shuo)
- Continue debugging EBIM. (Shengguo)
- Detail HARQ/RM structure. (Shengguo)
- Verify EBIM with random test cases. (Yun)
- Continue verifying DCC & DAGC. (Chuntao)
- Continue debugging RTL of DCC & DAGC. (Weifeng)
- Debug the revised RTL of Tx BIF. (Weifeng)
- Debug RTL of Block-V generation. (Gaohua)
- Debug RTL of Tx BIF. (Gaohua)
- Start verifcation effort of TDMA engine. (Lu)